Our Profile

Nikoil Profile

Nikoil is an international company established with the principle to develop and carry out various advance sectors including; New High Technologies, Oil and gas Commodity supply, Building Refineries, Supplying health care products and technology, Providing environmental solution, Providing energy, Information communication technology, Oil and gas technologies, and Financial and general consultation. With professional resources we always provide quality products with the best service.

Our Vision and Mission

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Installations and Records

  1. Chelyabinsk – installation of atmospheric distillation (ChTZ).
  2. Kaliningrad – installation of pyrolysis of tires, and installation of distillation of hydrocarbon raw materials.
  3. Ochyor – the project of linking to the site of a hydrocarbon processing plant, the installation of atmospheric distillation of hydrocarbon raw materials.
  4. Chelyabinsk – installation of atmospheric distillation (Stankomash).
  5. Troitsk – the project of anchoring to the site of a hydrocarbon processing plant.
  6. Ussolie-Sibirskoe – installation of atmospheric distillation.
  7. Nizhnekamsk – a project for the installation of atmospheric distillation.
  8. Sharypovo – project of anchoring to the site of a hydrocarbon processing plant, installation of atmospheric distillation.
  9. Anzhero-Surzhinsk – the project of anchoring to the site of a hydrocarbon processing plant, an atmospheric distillation unit.
  10. North Korea – the project of anchoring to the site of a hydrocarbon processing plant, an installation of atmospheric distillation of 500 tons per day.
  11. Troitsk (Chelyabinsk region) – a project for the installation of atmospheric distillation of 300 tons per day.
  12. Novosibirsk – supply of furnaces for the installation of production Krasnodar. Productivity of 250 tons per day for raw materials.
  13. Krasnoyarsk – the project of linking to the site of a hydrocarbon processing plant, an installation of atmospheric distillation of 250 tons per day.
  14. Omsk – installation of atmospheric distillation.
  15. Kandyagash city – project of anchoring to the site of the hydrocarbon processing plant, installation of atmospheric distillation of 750 tons per day (first line).
  16. Nizhnekamsk – installation of atmospheric distillation.
  17. Nizhnekamsk – installation of atmospheric distillation (second).
  18. Nizhny Novgorod – installation of atmospheric distillation of 30 tons per day.
  19. Kandyagash – the project of anchoring to the site of the hydrocarbon processing plant, the installation of atmospheric distillation of 750 tons per day (second line). Total productivity at the facility is 1 500 tons per day for raw materials.
  20. Chelyabinsk – the project of anchoring to the site of the hydrocarbon processing plant, the installation of atmospheric distillation of 250 tons per day. (our factory, our own).
  21. An atmospheric distillation unit was manufactured in Ufa (Salavat)
  22. Chillers have been manufactured and shipped with a capacity of 500 tons per day and 750 tons per day. Delivery – Kazakhstan, Atyrau, “Kulnafta”.
  23. September 2012. A coil was produced and shipped to the city of Och 300 tons.
  24. October 2012. A coil was produced and shipped in Zlatoust 300 tons.
  25. An installation of 150 tons per day was manufactured and shipped. Kazakhstan. The project of binding the equipment to the terrain has been completed.
  26. November 2012. A coil was manufactured and shipped in Kstovo.
  27. Ufa. Manufactured and started.
  28. Perm. Manufactured, mounted and launched.
  29. Ekaterinburg. Manufactured and shipped.
  30. Tula, installation atmospheric – 250 tons per day for raw materials. Vacuum – 150 tons per day for raw materials. Oxidation – 120 tons per day for raw materials. Installation and start-up have been carried out.
  31. Equipment is produced with a capacity of 1000 tons per day for its plant, in June-August 2014, modernization was carried out.
  32. 2014, summer – equipment was manufactured, delivered and put into operation in Nyagan.
  33. The equipment manufactured to improve the quality of diesel fuel, to deliver it according to GOST winter, Perm was shipped and launched.
  34. The equipment for clearing DT, and finishing from TU, GOST “winter” is made. Installation, start-up. Own factory.
  35. Perm, item 28. work was carried out to increase the capacity of the installation. The additional equipment was manufactured, integrated into the existing structure and 300 tons were launched.
  36. A “light vacuum” unit was built on its own installation. This technology significantly increases the yield of light fractions, is integrated into the atmospheric installation, does not require a separate licensing documentation of 1000 tons per day for raw materials.
  37. Furnaces, coolers and heat exchangers for the isomerization unit have been manufactured. Shipped. The city of Nyagan. August 2016 year.
  38. A thermo-catalytic cracking unit was built in its own production. Put into operation. September 2016 year.
  39. Vessels and heat exchangers for VernalOil are manufactured in Kazakhstan. Shipment is November 2016. The capacity is 1,500 tons per day.
  40. Coolers are manufactured in Tulu. October 2016 was shipped. 250 tons per day.
  41. The installation in Yaroslavl was manufactured, assembled and manufactured. November 2016 year.
  42. Furnaces are made. Yekaterinburg city. September of 2016.
  43. A catalyst regeneration plant for isomerization and dewaxing has been manufactured. Own production. December 2016.
  44. A heat exchanger is manufactured. Cooler. High-temperature cooler. Shipped. January 2017 year. G.Magnitogorsk. 250 tons per day.
  45. A gasoline isomerization and dewaxing unit is being manufactured. Own production. Present time.
  46. At present, a contract has been signed, prepayment received, a project has been made for tying equipment to the site to install 750 tons per day, at atmospheric pressure, in Kazakhstan.
  47. A contract has been signed, pre-design works are underway to install atmospheric distillation with a total capacity of 3,000 tons per day. A proposal is being developed for the following processing steps (vacuum, etc.)
  48. Heat exchangers are manufactured. Kazakhstan. The capacity is 1,500 tons per day for raw materials. Shipped.
  49. Manufactured snakes. Yekaterinburg city. Shipped.
  50. Manufactured serpent of the city of Sugrut. Shipped.
  51. A block of heat exchangers is produced, for the replacement of Avtolaval. Vakhrushevo. 300 tons per day for raw materials, for the installation of oxidation. Shipped.
  52. Vacuum and oxidation plants were manufactured, installed and commissioned. Uzbekistan.

Present Project

  1. EKN Project of Mini Refinery 1,000 bpd EMP Malacca Strait, Selat Panjang Regency, Riau Province
  2. Investigation for the installation 100.000 barrels/ day petrochemical refinery in Libia
  3. Developing new technologies for heavy duty destructors for destroying waste materials up to 240 tons/ day
  4. Finalizing the plasma generators of different sizes from 5 Kilo watt/ hour up to 250 Kilo watt per hour in the form of modular generators. So that they can be used to provide many megawatts per hour on demand
Scroll to Top